简体中文
铝合金地板的日常使用与维护
2018-09-9
洁净度要求The cleanliness requirements: 洁净室施工时因灰尘管制要求严格,为确保避免灰屑遗漏残留,影响将来洁净室之使用,所有地板在厂内务必先以空压机冲洗干净再以塑胶袋包装,才能运进工作场所, 施工人员进场前必须更换净化室专用工作服、工作鞋、帽和手套, 地板切割必须隔离于独立的工作室,以确保工作环境洁净安全。 In the construction of clean rooms, due to strict dust control requirements,in order to ensure the residual of dirt and affect the use of clean rooms in thefuture, all panels must be cleaned in air compressors and then packed in plasticbags before entering the workplace. One must change the special work clothes,work shoes, caps and gloves before entering the room. The floor cutting mustbe operated one independent area to ensure the working environment is cleanand safe. 设备运输 Equipmengt handling: ·提前规划好设备运输路线,划定区域作为设备运输通道; ·运输通道处地板表面须铺设3mm~5mm不锈钢钢板进行保护; ·地板上移动搬运设备时,严禁设备直接在地板上滚动辗压; ·尽可能选用轮子直径较大的液压车作为运输工具; ·运输工程中尽可能做到匀速移动设备,避免对地板产生冲击载荷。 ·Plan the transportation routes of the equipment in advance andreduce the area as a transportation path for the equipment; ·3mm~ 5mm thick stainless steel plate should be laid on the floorsurface of the transport path for protection; ·When handling equipment on the floor, it is forbidden to roll theequipment directly on the floor; ·Use hydraulic vehicles with larger wheel diameters astransportation means whenever possible; ·The equipment should be moved as evenly as possible to avoidimpact loads on the floor. 设备安装要求 Equipment installation requirements: ·当设备直接放在铝合金地板上时,须采用外形尺寸150* 150mm或更大尺寸、厚度5mm~10mm的不锈钢板垫在设备的脚下,扩大与地板的接触面; ·设备较重或有防振要求时, 通常设备要做独立基础( 钢制平台或浇筑混凝土平台),地板安装时要与设备基础分离开。 ·When the equipment is placed directly on the aluminum raisedfloor, astainless steel plate with an outer dimension of 1 50x150mm ormore and athickness of 5mm to 10mm must be placed under the foot ofthe device. ·Equipment is recommended to be supported by individual basis, ifit' S too heavy or it vibrates strongly during the operation.
post_content; echo $content; ?>
  • <
  • 1
  • >
X